Our technical engineering services
We support your projects from needs analysis to equipment reception, with a structured method, clear deliverables and an impartial advisory role.
How to read this page
The ten services can be ordered separately or as a chain. The first five prepare a purchasing decision; the next five secure delivery, from bid analysis to acceptance and integration.
- Each service has a code TS-01 to TS-10, named deliverables and an indicative duration.
- A service combines with a reference sub-function: "T2.2·TS-04" = sizing of a pumping system.
- The quote is issued only after the file is opened, in FCFA, based on the need as actually framed.

The ten services, TS-01 to TS-10
Each card gives the objective, deliverables, XP-NOVA's role and an indicative duration; services are ordered separately or as a chain.
Needs analysis
Frame the technical need precisely before any commitment: understand the existing situation, identify gaps and define verifiable objectives.
Deliverables
- Needs analysis report
- Existing systems mapping
- Gap identification
Role of XP-NOVA
XP-NOVA acts as an independent advisor, with no ties to suppliers: the analysis does not orient towards a specific brand or technology.
Indicative duration: 5 to 10 days
Variants
Inform a decision by comparing alternative solutions objectively, based on explicit technical and economic criteria.
Deliverables
- Variants study
- Technico-economic comparison
- Recommendation
Role of XP-NOVA
The recommendation is reasoned and traceable: XP-NOVA remains impartial towards suppliers and receives no commission.
Indicative duration: 10 to 15 days
Technical architecture
Design the overall system architecture to ensure consistency of equipment, flows and interfaces before any purchase.
Deliverables
- Functional diagrams
- System architecture
- Sizing note
Role of XP-NOVA
The role of XP-NOVA is to architect and specify: physical implementation remains entrusted to service providers according to the mandate.
Indicative duration: 10 to 20 days
Sizing
Determine exactly the necessary capacities to avoid costly oversizing as well as risky undersizing.
Deliverables
- Sizing calculations
- Calculation notes
- Capacity specifications
Role of XP-NOVA
Calculations are based on documented and verifiable assumptions, provided to the client for any subsequent validation.
Indicative duration: 5 to 15 days
Specifications
Transform the need into enforceable specifications, in order to launch fair and comparable consultations between suppliers.
Deliverables
- Technical specifications
- Evaluation grid
- Selection criteria
Role of XP-NOVA
The specifications are written without favoring a supplier: the selection criteria are neutral and weighted in advance.
Indicative duration: 10 to 15 days
Offer analysis
Review and compare received offers rigorously to objectify the supplier choice, beyond price alone.
Deliverables
- Comparative analysis
- Evaluation grid
- Choice recommendation
Role of XP-NOVA
The review is impartial and documented: XP-NOVA controls the compliance of offers with specifications, without bias.
Indicative duration: 5 to 10 days
Testing
Verify, through test protocols, that the delivered equipment actually meets the specifications before commissioning.
Deliverables
- Test protocols
- Verification grids
- Test reports
Role of XP-NOVA
XP-NOVA defines and supervises tests as a trusted third party; material execution remains with the supplier or a service provider.
Indicative duration: Depending on complexity
Performance verification
Measure on site that actual performances reach contractual thresholds, in real operating conditions.
Deliverables
- Test report
- Capacity validation
- Compliance certificate
Role of XP-NOVA
Verification is factual and traced; it does not replace regulatory certification, outside the scope of XP-NOVA.
Indicative duration: 3 to 7 days
Reception assistance
Secure equipment reception: final compliance verification and documented transfer to operation.
Deliverables
- Reception minutes
- Transfer documentation
- Training materials
Role of XP-NOVA
XP-NOVA assists the client in their receiver role, ensuring objectivity of the minutes vis-à-vis the supplier.
Indicative duration: 2 to 5 days
Integration support
Make sensors, PLCs, management software and traceability platforms work together, and check that the expected data reaches where it is useful.
Deliverables
- Integration plan
- Interface specifications
- Functional acceptance report
Role of XP-NOVA
XP-NOVA frames and accepts the integration; configuration and development remain with the selected integrators.
Indicative duration: Depends on complexity
What we do not do
- Equipment supply (we do not sell equipment)
- Installation works (we do not carry out installations)
- Operation and maintenance (we do not ensure maintenance)
- Regulatory certification (a technical verification is not a certification)