←A division of XP-NOVA
← Back to the reference

T2 · Irrigation and water

T2.3 Storage and conveyance

PhysicalResist for Durability

How to read this sheet

The sheet describes a technical function, not a product: the equipment listed are types, not brands. The sizing parameters are those XP-NOVA calculates before any purchase.

  • P = physical, N = digital, H = hybrid (physical device driven by digital control).
  • "Framework being confirmed" flags a standard or authority we are still verifying.
  • Key services are those this sub-function mobilises most often.

Typical equipment

  • T2.3-01TankPhysical
  • T2.3-02Water towerPhysical
  • T2.3-03Geomembrane pondPhysical
  • T2.3-04PipelinesPhysical

Sizing parameters

Autonomy (days), service pressure, diameters

Key risk in Cameroon

Leaks, evaporation, installation quality

International good-practice references

Good practice.

Full technical sheet on request

Complete list of risks and constraints, Cameroonian authorities and applicable texts, CV1–CV9 life-cycle grid: provided after the file is opened.

Request the full sheet

RT-TECH reference v1.0 © XP-NOVA SARL — reproduction prohibited without written permission.

WhatsApp